It did not take too long to make the individual bits, but fitting it all together and working out 'how' to hold the parts in place for welding (without loosing the pin alignment for the sheaves) has been quite tricky. The sheaves are running on a 1/2 inch stainless steel rod. I will drill sideways holes either end of the rod and fit clevis pins to keep everything in place, and allow for replacement of the sheaves if neccessary in the future
Sheaves fitted and now ready for welding.
No comments:
Post a Comment